Your cart is currently empty!

Floor Preparation
1. Remove the existing flooring

2. Check the level of the subflooring

3. Sand down high spots

4. Clean and repair old subflooring

5. Cover the subflooring with a bonding agent

6. Mix the levelling compound to a creamy consistency

7. Pour the compound over the subflooring

8. Smooth out inconsistencies with a hand trowel

9. Allow the compound to dry

10. Sand the entire floor

11. Check the level again

